Plans & Existing Conditions
Review approved plans, accessible prior work, jurisdiction requirements and project-specific corrections.
ADUs · Garage Conversions · Room Additions
Coordinated ADU and garage conversion construction for Southern California homeowners—from plan review and structural work through utilities, finishes and final inspections.
A complete construction scope
An accessory dwelling unit combines structural, plumbing, electrical, HVAC, energy and finish requirements in a compact footprint. The success of the project depends on sequencing those systems correctly.
Matamoros Construction Inc. works from the approved documents, reviews accessible existing conditions and coordinates the remaining trades and inspections required to move the project toward completion.
Every proposal identifies project-specific inclusions, exclusions, allowances and permit responsibilities.
Typical project scope
Final work is based on existing conditions, approved plans when applicable, and your written construction agreement.
Review approved plans, accessible prior work, jurisdiction requirements and project-specific corrections.
Foundation or slab work, framing, shear, roofing, windows, exterior assemblies and weather protection.
Underground and rough systems, panels and service coordination, all-electric equipment and required testing.
Insulation, drywall, texture, interior doors, flooring, cabinetry, paint, fixtures and trim.
Coordinate applicable inspection milestones and complete work within the contracted scope to address corrections.
Finish details, startup, cleanup, walkthrough and closeout of the construction scope.
Selected project work
Real field photos showing structural preparation, framing and completed living space.

Foundation formwork, reinforcement and underground coordination before concrete placement.

Framing and rough-in phase with structure and building systems coordinated together.

Completed interior with flooring, paint, trim, lighting and finish details.
Permit-aware construction
Garage conversions and partially completed ADUs need careful review. Concealed or previously completed work cannot be assumed compliant until it is documented or accepted by the authority having jurisdiction.
Common questions
Yes, these projects generally require approved plans, permits and multiple inspections. Requirements vary by city, property and scope.
Potentially. We first review the approved plans, accessible conditions, permit history and inspection status. Concealed or unapproved work may require additional investigation or correction.
The schedule depends on the size, existing conditions, plan status, utility work, inspection availability and finish selections. The proposal will identify an estimated construction duration for the defined scope.
Only when specifically listed. Permit fees, design services, utility charges and major service upgrades are identified separately in the written proposal.
Ready to discuss the work?
We will review the project information and determine the right next step for an accurate proposal.