California Licensed General Contractor · CSLB #1124114Licensed · Bonded · Insured · Workers’ CompensationCSLB #1124114 · Licensed · Bonded · Insured · Workers’ Comp

Before & After · Real transformations

See the work—not just the finished photograph.

These paired photographs show the same projects during construction and after the finish work was completed.

Exterior renovation & covered porch

The original front elevation was renewed with a clean exterior finish and a new full-width covered porch.

Original residential exterior and narrow covered entry before renovation
Before

Original entry, exterior finish and landscaping before construction.

Renovated white residential exterior with a full-width covered porch
After

Finished exterior with coordinated trim, windows and a full-width covered porch.

Explore decks & exteriors

Patio enclosure addition

An open patio frame became a finished, weather-protected room tied cleanly into the existing home.

Wood wall framing around an existing residential patio before enclosure
Before

Wall and opening layout during structural framing of the patio enclosure.

Completed white patio enclosure with windows doors trim and roof details
After

Completed enclosure with windows, doors, exterior finish and roof transitions.

Explore new construction

Herringbone floor installation

Detailed layout, cuts and leveling were completed into a continuous wood-look tile finish.

Wood-look herringbone tile installation in progress with leveling clips
Before

Herringbone field layout in progress with controlled joints and leveling clips.

Completed wood-look herringbone tile floor across a bedroom and bathroom entry
After

Completed herringbone finish carried cleanly through the room and doorway.

Explore flooring installation

Bathroom reconstruction

The room was opened to the structure, rebuilt with the concealed work first and finished as a complete bathroom.

Bathroom shower area opened to wall framing during demolition
Before

Shower area opened for plumbing, substrate and waterproofing reconstruction.

Completed bathroom with tiled shower vanity flooring and fixtures
After

Completed bathroom after waterproofing, tile, glass, fixtures and finish work.

Explore kitchens & bathrooms